We’re excited to share progress on this multi-level landscaping project in Newtown.
Stage 1 ✔️
• Ground preparation
• Concrete set-out and preparation
Stage 2 ✔️
• Poured over
10m³ of concrete
• Installation and preparation for
TifTuf turf
• Screening installed to neatly hide pool equipment
This site will continue to evolve with
future landscaping stages yet to be determined — similar to some of our long-term projects that develop over several years.
Stay tuned as this space transforms step by step 👀